Southern California Gas ended a high-linepack OFO Sunday. Northern California neighbor Pacific Gas and Electric had a systemwide high-inventory OFO in effect Sunday but canceled it Monday.

Gulf South said it expected to complete maintenance on the 30-inch diameter Bistineau Storage Lateral in northwest Louisiana Monday and was accepting Timely Cycle nominations there for Tuesday’s gas day.

Questar said system integrity verification digs performed on its ML 68 segment revealed anomalies that will need to be repaired before it can raise the pressure to normal operating conditions. ML 68 capacity will remain limited to 50,000 Dth/d until repairs can be made in July, the pipeline said.

Columbia Gas plans to take Waynesburg Compressor Station in Greene County, PA out of service for five days starting Tuesday to convert Unit #1 to series/parallel operations. Two production meters on Line 1570 will be shut in during the work.

©Copyright 2011Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.