Pacific Gas & Electric issued a systemwide Stage 2 high-inventory OFO for its California Gas Transmission system, effective Saturday. Penalties of $1/Dth were set for noncompliance with a 16% tolerance on positive daily imbalances.

Due to a continuing “operational upset” at the Williams Florida Plant (see Daily GPI, June 8), El Paso said it will keep volumes at the IWMSFLOR interconnect in the Bondad pooling area capped at zero through Wednesday in order to maximize scheduled flows on its system.

©Copyright 2009Intelligence Press Inc. All rights reserved. The preceding news reportmay not be republished or redistributed, in whole or in part, in anyform, without prior written consent of Intelligence Press, Inc.