Daily GPI / NGI All News Access

Transportation Notes

Transportation Notes

April 26-30 turbine modification at Transwestern's Bloomfield Station on the San Juan Lateral will cut 25,000 MMBtu/d of Ignacio (CO) to Blanco (NM) capacity.

As required by Louisiana's Calcasieu Parish Drainage District, Sabine Pipe Line must lower part of its 22-inch mainline. The work will cut capacity at Florida Gas Transmission's Sabine-Kaplan interconnect to zero today through Sunday.

©Copyright 1999 Intelligence Press Inc. All rights reserved. The preceding news report may not be republished or redistributed, in whole or in part, in any form, without prior written consent of Intelligence Press, Inc.

ISSN © 2577-9877 | ISSN © 1532-1231
Comments powered by Disqus