Pacific Gas & Electric issued a low-inventory Stage 1 OFOfor today carrying penalties of $1/dth for negative imbalancesexceeding 5% of scheduled volumes.

NOVA returned its daily imbalance tolerances to a normal -10/+10%Tuesday following a three-day change due to low linepack (see Daily GPI, April 6).

A-Line hydrostatic testing at PG&E GasTransmission-Northwest’s Station 9-A (Ione, OR) is limitingKingsgate capacity to 2,450 MMcf/d (normally 2,620 MMcf/d duringApril) through Saturday.

©Copyright 1999 Intelligence Press Inc. All rights reserved. Thepreceding news report may not be republished or redistributed, inwhole or in part, in any form, without prior written consent ofIntelligence Press, Inc.